MV BEATA – SAMPLE

Last Update Mon 13/07/2020 at 10.00 hrs

// ETA Rostock:  2018-11-18 08:00 LT (UTC +1) //

  • Foreman:
    Victor Fernández +34 (610)719 883
  • Main Office: Muelle ComerciaL- Ferrol
  • Phone: +34 (981) 359 244
THU 08/10/2018
08.00 - 13.00 / 14.30 - 22.00
FRI 09/11/2018
08.00 - 13.00 / 14.30 - 22.00
SAT 10/11/2018
Start Ops. 08.00 - Completion

ENTRANCE

ANCHORAGE POSITION: 43º 39´ N – 007º 19,2´ W Bearing end breakwater = 110. Distance: 1.0´ Ground - Sand

The route takes us to Burela port at 43 ° 39 ‘N, 07 ° 22’ W and 0.6 miles S of Cape Burela. Once Corporal Burela has been identified, reaching the port has no greater difficulty than coasting towards the S, giving the coastline a margin of respect of 300 meters. The port is well identified by the breakwater.
The port of Burela is protected by a large dike that starts from the beach and that has about 800 meters of direction 125 °. At 560 meters from the start there is a heel that forms a spring of about 35 meters.

RESTRICTIONS

Master, please note that max. draft is 8 m. (Hightide)

No congestion ,no special restrictions.

Max. Lo: 125 m.

SERVICES

Port has a security company at Port, if any crewmember needs go out outside of port installations, it´s good idea has passport himself.

In order to apply permission to enter the port/bert in Cariño, we need following documents:

  • ITC (International Tonnage Certificate)
  • ISSC (International Ship Security Certificate)
  • Cert. of civil liability for damages produced by bunker pollution (issued by flag)
  • P & I – Cert. of Entry
  • Safe Manning certificate
  • Residues declaration (Anex II)
  • ISPS (Also the CSO and SSO names and contract details in full)
  • Crewlist
  • General Declaration
  • Loading plan for 1 gang.
  • Max. draft on arrival
  • Ship Particulars

LOADING INFO (UPDATES)

Sun 11/11

  1. 21.15 – 23.15   Loading Completed
  2. 20.30 – 21.15  Dinner´s time
  3. 13.45 – 20.30 continuous loading
  4. 13.00 – 13.45 stev. Lunch time
  5. 11.05 – 13.00 stev. Start Loading on deck
  6. 08.15 – 11.00 crane breackdown
  7.  00.30 – 01.50 Intermedial Draft Survey

Sat 10/11

  1. 20.45 – 00.30 Holds Completed
  2. 20.00 – 20.45 Dinner’s Time
  3. 16.30 – 20.00 Continuous Load.
  4.  16.10 – 16.30 Shifting Hold N3
  5. 16.10 – Hold N2 completed
  6. 13.00 – 14.30 stevedores Lunch time
  7. 10.00 hrs Hold N1 completed
  8. 08.25 hrs  – Resume Load. H N1

Fri 09/10

  1. 21.00 hrs Loading Stopped
  2. 17.55 – 18.30 Shifting crane from Hold N3 to N1 for adjust stability.
  3. 14.30 – 17.55 /  Loading cont.
  4. 13.00 – 14.30 / Lunch Time
  5. 10.40 Start Hold N3
  6. 08.30 Start Load.

Thu 08/11

  1.  23.00 Loading Interrupted
  2.  21.00 – 21.45 Dinner
  3.  18.00 – Start Load. 2 cranes
  4. 15.25 – 16.30 Crane Breackdown
  5. 13.00 – 14.30 – Stevedores Lunch Time
  6.  09.00 Start Loading Hold N2
  7.  07.45 – 08.50 hrs  Innitial Draft Survey //

PRE - ARRIVAL INFO (UPDATES)

  1. TUE  06/11    22.00 hrs  //  06/11  20.40 lt   Dpr Pasajes //    ETA Burela p.st 07/11  21.00 lt w.p
  2. TUE 06/11  08.00 lt       // Actually discharging at Pasajes. ETC:  TUE 06/11 Eve or WED 07/11 AM
  3. MON 05/11  07.00 lt     // Discharging commenced    // ETC/ETS  06/11  pm or 07/11 mrng
  4. SAT 03/11 20.25 lt        // All fast at berth – Lezo 2
  5. FRI 02/11/2018 at 10:00 hrs  // Vessel anchoring in Pasajes, waiting for Discharge// ETA Burela – THU 08/11/2018 AM

CARGO DOCS

DEPARTURE

PORT LOG INFO

PORT LOG.
DAY
HOUR
ARRIVES ON ROADS 08/11/2018 07.15
VESSEL ANCHORED
ANCHOR UP
PILOT ON BOARD 08/11/2018 07.15
VESSEL BERTHED 08/11/2018 07.40
N.O.R Tendered 08/11/2018 07.15
N.O.R Received 08/11/2018 08.00
Start Loading. Ops 08/11/2018 09.00
Loading Compl. 11/11/2018 23.15
E.T.S 12/11/2018 09.00

CONDITIONS

DRAFTS (M.)
ARRIVAL
DEPARTURE
FORWARD 2.30 5.5
AFTER 4.05 6.4
BUNKERS
ARRIVAL
DEPARTURE
FUEL OIL MT MT
M.G.O 99.20 MT 96.80 MT
LUB OIL 9.200 LTR 10.700 LTR
F. WATER 38 MT 30 MT

ANY QUESTION?

    BRL- POSITION
    CARGO
    HOLD N1 1.052,80 MT
    HOLD N2 2.000,00 MT
    HOLD N3 1.850,084 MT
    DECK 1.270,981 MT
    TOTAL 6.173,861 MT

    LOADING RATE

    • THU
    • FRI
    • SAT
    • SUN

    LOAD. PROGRESS

    • THU
    • FRI
    • SAT
    • SUN